TEMPLE CONSTRUCTION
Our request to the community to please sponsor individual item or part of it, of this great project, and be a permanent part of New York Kali Mandir and Community Center. Or you may donate any amount of money to ‘Temple renovation fund’. Each sponsor/donor will be recognized in a special way after completion of this project.
| 1 | Breaking all the walls and half barriers to make a big hall. | 1000.00 |
| 2 | Closing front openings of the building and make an entrance to the building from the parking lot. | 1500.00 |
| 3 | The entrance will be enclosed by a 10’x 5’ Plexiglas room with provision of shoe rack and coat rack. | 7000.00 |
| 4 | Entrance door will be double door fiberglass with wood finish. | 1500.00 |
| 5 | All inside walls will be finished with 1’ foam insulation and sheetrock. | 6000.00 |
| 6 | Remove and replace existing ceiling. | 1500.00 |
| 7 | A 200cfm exhaust fan will be place over the area of “Hom”. | 1500.00 |
| 8 | Remove existing tube lights from celling. High hat light to be placed along the celling and three fans. | 2000.00 |
| 9 | Track lights installed to focus on deity. | 500.00 |
| 10 | Remove old windows and install color glass brick windows. | 1500.00 |
| 11 | Replacing the skylight dome. | 2000.00 |
| 12 | Interior and exterior painting. | 1500.00 |
| 13 | Install wrought iron fence along the outskirt of the front of the property with a sliding iron gate | 5000.00 |
| 14 | Build a temple facade connecting two building and temple facade on top of two building. | 20000.00 |
| 15 | New heating and air-condition system. | 7000.00 |
| 16 | A trailer on our back yard with three/four rooms for priest quarter/library/office space for community organizations. | 6000.00 |
| 17 | Making a paved open space at the back of the proposed new temple for a open seating area /a place for fire rites/other religious activities. | 5000.00 |
| 18 | Breaking the middle wall of the present temple building(614) for better use of space –this will be our future community center. | 2500.00 |
| 19 | Replace and rebuild asphalt roof of the 614 building (done) with new gutter and insulation of duct system. | 9000.00 |
| 20 | New water fountain for drinking water in both buildings. |